Printed Copies Are Uncontrolled
Wiki ID: 291
Author: Trent Plungas
Revision ID: 1380
Revision Date: 07-07-22
Specific instructions to add options to mills, set up mills or add tools.
2OP M10 & M11 ATC Set Tool Locations & Z Axis Height
30120RX Hydraulic 8 Tool Turret - Installation
Big Lathe - 30120RX Spindle Centerline Height
Collet Closer Installation
Field Installation Procedure - Lathe Coolant Pump Option
Field Installation Procedure - Lathe Lamp Option
Field Installation Procedure - Mills Auto Lube Option
Field Installation Procedure - Mills Lamp Option
Field Installation Procedure - Mills Spray Cool Option
How to Level the 30120RX
K3 PSC-K3 Option - Spindle Control Upgrades
RLX 4 Tool Turret Field Installation
RLX 8 Tool Turret Field Installation
Siemens - RMVM Installation
TC2 Hydraulic Chuck and 5C Collet Chuck Installation
TC2 Leveling Procedure
TC820si & TC820LTYsi Lathe: Calibrate Tool Setters
TMC 12&14 - Install Electronic Hand Wheels Option
TMC 4 Axis 31538: Set Y & Z Offsets & Base Tool Offset
TMC 4th Axis - FST Tailstock Installation
TMC 4th Axis - Install Hardware "Ready Kit" & Test
TMC12 & TMC14 - Leveling & Tram
TMC5, TMC7, & TMC10 - Leveling & Tram
TMC5/7/10 - Install Electronic Hand Wheels Option
VMC 4th Axis 7/10 or 12/14 Installation
VMCsi Probe Part Option - Set Up & Calibrate Spindle Probe
VMCsi Probe Tool Option - Set Up & Calibrate Tool Setting Probe
VMCsi&TCsi - Add New Option License for Customer
VMCsi: BT40 Option - ATC Arm Replacement
Past 24 Hours: 0
Past 7 Days: 0
Past 30 Days: 1
All Time: 447