Skip to main content
  1. Turn off power to machine!
    • Turn off power to machine!

    • In the Electrical cabinet, locate the failed terminal block.

    • Take note of how the wires are wired to terminal block. Remove the screws that hold the wires.

    • Remove the terminal block off of the rail.

    • Install the replacement part and perform steps in reverse order.

    • •Q19= ARM TOOL CHANGER MOTOR 2 •Q22= SPINDLE OIL CHILLER PUMP •Q21= SPINDLE THROUGH COOLANT PUMP •Q11= AUGER MOTOR •Q17= TOOL CHANGER •Q20= COOLANT WASH PUMP •Q5= COOLANT PUMP

Finish Line

Fataimoemanu Tohi

Member since: 02/11/2020

12 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 1

Past 7 Days: 1

Past 30 Days: 4

All Time: 64