-
-
Power off machine before removing any cables.
-
Remove the 8 screws from the rear pendant casing.
-
Disconnect the following cables: Estop cables, Toolroom vs Production Operations cable, Front panel Handwheel cables and Overlay ribbon cables.
-
Remove the 7 bolts that hold the Run Panel.
-
Install the replacement part and perform previous steps in reverse order.
-
Power on machine and verify the Run panel functions.
-
Almost done!
Finish Line