Skip to main content
  1. Review the jogstick drawing and note color coded items for future steps Note the orientation of the jogstick relative to direction of travel Note the pinout of the jogstick connector relative to the direction of the jogstick handle
    • Review the jogstick drawing and note color coded items for future steps

    • Note the orientation of the jogstick relative to direction of travel

    • Note the pinout of the jogstick connector relative to the direction of the jogstick handle

    • Note jogstick connector pinout. Test leads are inserted in "B" and "E" of the jogstick connector

  2. Set the voltmeter in continuity mode as shown Note that the voltmeter reads "OL" which means no continuity
    • Set the voltmeter in continuity mode as shown

    • Note that the voltmeter reads "OL" which means no continuity

    • Move jogstick handle in the X- direction

    • Voltmeter now reads .000 which means that there is continuity as expected

    • Leaving the test lead in "B", move the other test lead to "F" to test X+, to "C" to test Z+, and to "D" to test Z-

Finish Line

Mark Takahashi

Member since: 01/21/2020

2 Guides authored

Team

Siemens Internal Member of Siemens Internal

50 Members

29 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 1

Past 7 Days: 1

Past 30 Days: 3

All Time: 112